Link Bridge

4 & 8 Lakeside Drive, Burwood

Project

Link Bridge – 4 & 8 Lakeside Drive, Burwood

Project Description

The construction of a pedestrian link bridge was a crucial infrastructure project aimed at enhancing connectivity and ensuring the safety and convenience of pedestrians between two office buildings. This project involved the design, planning, and construction of a bridge that would connect two separate offices, allowing pedestrians to cross safely over a carpark.

High quality, cost effective services

Our Work

At Astra, we have worked across a range of commercial and industrial construction projects

  • Container Deposit Scheme Mulgrave

    Mulgrave VIC

    Container Deposit Scheme 1

  • Container Deposit Scheme Pakenham

    Pakenham VIC

    Container Deposit Scheme 2

  • Somerton

    Northern Melbourne Parcel Distribution Centre